Saturday, July 24, 2010

Poomukham and Slope roof at Ground level

Pictures show work details for Poomukham and slope roof at Ground Floor level concreted on 23/7/10.

DSC00126

DSC00128

DSC00129

DSC00134

DSC00135

DSC00136

DSC00138

DSC00142

DSC00140

Friday, July 16, 2010

Work on Poomukham and front verandah

Work on Slope roof for Poomukham and Chuttu verandah started even though heavy rain disrupts work quite often.

Door ,windows frames are fixed for both ground floor and First Floor.A few of these which are short are under construction at Our elamakkara site.Pictures follows:

DSC00076

DSC00088

DSC00089

DSC00090

DSC00091

DSC00092

DSC00093

DSC00094

DSC00095

DSC00097