Saturday, July 24, 2010

Poomukham and Slope roof at Ground level

Pictures show work details for Poomukham and slope roof at Ground Floor level concreted on 23/7/10.

DSC00126

DSC00128

DSC00129

DSC00134

DSC00135

DSC00136

DSC00138

DSC00142

DSC00140

Friday, July 16, 2010

Work on Poomukham and front verandah

Work on Slope roof for Poomukham and Chuttu verandah started even though heavy rain disrupts work quite often.

Door ,windows frames are fixed for both ground floor and First Floor.A few of these which are short are under construction at Our elamakkara site.Pictures follows:

DSC00076

DSC00088

DSC00089

DSC00090

DSC00091

DSC00092

DSC00093

DSC00094

DSC00095

DSC00097

Saturday, June 26, 2010

First Floor Brick work

Picture show inside of First floor Brick work

DSC00064

Tuesday, June 22, 2010

Brick work continuing

Brick work for first floor continued with ground floor Electrical work in progress.Pictures show precast stair steps being fixed for going up to roof top and brick work in progress

DSC00053

DSC00054

DSC00055

DSC00056

Friday, June 18, 2010

Brick work progressing

Pictures below show brick work for first floor progressing.Precast stair for Roof top are being concreted and kept in place as brick work progresses

DSC00040

DSC00041

Friday, June 11, 2010

Brick work reaching First Floor lintel level

Brick work for first floor,electrical cutting for Ground Floor,Manufacturing of door and windows for first floor are in progress.Pictures show work in progress.

DSC00037

DSC00038

DSC00039

DSC00036

Thursday, May 20, 2010

Round columns raising,Wooden joinery

All round columns in concrete for verandah are raised.wooden joinery for Ground floor reached site and few doors are fixed.Pictures follows

DSC00017 

DSC00018

DSC00019

DSC00020

DSC00021

DSC00022